翻訳と辞書
Words near each other
・ Cost accrual ratio
・ Cost allocation
・ Cost analyst
・ Cost approach
・ Cost auditing
・ Cost basis
・ Cost center
・ Cost centre (business)
・ Cost competitiveness of fuel sources
・ Cost contingency
・ Cost curve
・ Cost database
・ Cost driver
・ Cost efficiency
・ Cost engineering
Cost escalation
・ Cost estimate
・ Cost estimation in software engineering
・ Cost estimation models
・ Cost externalizing
・ Cost function
・ COST Hata model
・ Cost leadership
・ Cost model
・ Cost object
・ Cost of attendance
・ Cost of capital
・ Cost of carry
・ Cost of conflict
・ Cost of delay


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Cost escalation : ウィキペディア英語版
Cost escalation
Cost escalation is defined as changes in the cost or price of specific goods or services in a given economy over a period. This is similar to the concepts of inflation and deflation except that escalation is specific to an item or class of items (not as general in nature), it is often not primarily driven by changes in the money supply, and it tends to be less sustained. While escalation includes general inflation related to the money supply, it is also driven by changes in technology, practices, and particularly supply-demand imbalances that are specific to a good or service in a given economy. For example, while general inflation (e.g., consumer price index) in the US was less than 5% in the 2003-2007 time period, steel prices increased (escalated) by over 50% because of supply-demand imbalance. Cost escalation may contribute to a project cost overrun but it is not synonymous with it.
Over long periods of time, as market supply and demand imbalances are corrected, escalation will tend to more-or-less equal inflation unless there are sustained technology or efficiency changes in a market.
Escalation is usually calculated by examining the changes in price index measures for a good or service. Future escalation can be forecast using econometrics. Unfortunately, because escalation (unlike inflation) may occur in a micro-market, and it may be hard to measure with surveys, indices can be difficult to find. For example, the Bureau of Labor Statistics has a price index for construction wages and compensation (what the construction contractor's labor cost), but has none for the prices that owners must pay the construction contractor for their services.
In cost engineering and project management usage, escalation and cost contingency are both considered risk funds, that should be included in project estimates and budgets. When escalation is minimal, it is sometimes estimated together with contingency. However, this is not a best practice, particularly when escalation is significant.〔"Escalation Estimation: Working With Economics Consultants", John K. Hollmann; Larry R. Dysert, 2007 AACE International Transactions, AACE International, Morgantown, WV, 2007〕
== References ==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Cost escalation」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.